ECS undertakes stop log handling system installation and maintenance work at Colwick Sluice

ECS undertakes stop log handling system installation and maintenance work at Colwick Sluice Spanning the River Trent, Colwick Sluice is on the frontline of flood defences designed to protect the city of Nottingham. Working on behalf of the Environment Agency, ECS Engineering Services has undertaken a large project to enhance operations at the site, including…

Details

ECS Engineering Services retains Achilles UVDB accreditation with 100% score

Following a remote two-day audit from Achilles, ECS Engineering Services has announced it has renewed its UVDB supplier status with a 100% score in all assessed categories. This validates ECS’ organisational management systems as exemplary in terms of health and safety, environmental sustainability, quality and corporate social responsibility (CSR). Rebecca Murfin, SHEQ Manager at ECS,…

Details

ECS on course to bring 70 South Downs and Solent trash screens up to date for the Environment Agency

ECS on course to bring 70 South Downs and Solent trash screens up to date for the Environment Agency ECS Engineering Services has been contracted to upgrade over 70 trash screen sites located in the South Downs and the Solent for the Environment Agency. Designing and manufacturing the new trash screens in-house, ECS is also…

Details

Severn Trent Water appoints ECS as regionwide framework contractor for mechanical services

Severn Trent Water appoints ECS as regionwide framework contractor for mechanical services Severn Trent Water has appointed ECS Engineering Services as a framework contractor for mechanical services in all regions. ECS will provide design, installation, maintenance and testing services for mechanical assets at water and wastewater facilities – with an emphasis on delivering support to…

Details

17 Nottingham trash screen sites overhauled by ECS

17 Nottingham trash screen sites overhauled by ECS ECS Engineering Services has recently collaborated with the Environment Agency to overhaul trash screens in 17 locations throughout Nottingham. The comprehensive project has involved the total replacement, redesign and infrastructural development of the trash screen sites – improving the water flow through a multitude of culverts to…

Details

Footbridge innovations make installation easy and ensure long life

Footbridge innovations make installation easy and ensure long life A new footbridge providing access to an Environment Agency groundwater pumping station near Newbury in Berkshire has won the praise of local residents because of the minimal disturbance during installation. The facts that it has little visual impact and will require hardly any maintenance during its…

Details

The Coal Authority appoints ECS Engineering Services as a framework contractor

The Coal Authority appoints ECS Engineering Services as a framework contractor The Coal Authority has appointed ECS Engineering Services as a framework contractor for minor works including scheme refurbishments, liner replacements and access track works for the next four years. ECS will assist the Coal Authority in protecting the public and safeguarding the environment from…

Details